Filtered By: Topstories
News

No scheduled power interruption in Meralco areas on Christmas week


There will be no scheduled power service interruption in areas covered by the Manila Electric Company from December 23 to 28, 2024.

Based on the advisory posted on Meralco website, the next scheduled interruption will be on December 29, Sunday, in parts of Laguna, Bulacan, Batangas due to maintenance activities.

Here are the affected areas:

DECEMBER 29

LAGUNA

NGCP preventive maintenance and testing works along NGCP Lumban 52KY - Caliraya 51CL 69kV transmission lines, and inside NGCP - Caliraya substation.

Between 5 a.m. and 6 a.m. and then between 12 noon and 1 p.m.:

  • Portion of Majayjay – Liliw Municipal Road from Meralco – Botocan substation to and including the whole towns of Liliw, Nagcarlan and Magdalena; Bgys. Bukal, Coralao, Ibabang Banga, Ilayang Banga, Malinao, May-it, Munting Kawayan, Olla, Oobi, Pangil, Panglan, San Isidro, San Roque, Sta. Catalina, Suba, Talortor and Town Proper in Majayjay; Bgys. San Antonio I and Sta. Maria Magdalena in San Pablo City; Bgys. Entablado and Tala in Rizal; Bgys. San Jose, Oogong, Malinao and Alipit in Sta. Cruz.
  • Portion of Pedro Guevarra Ave. from Meralco – Sta. Cruz substation to and including Pedro Guevarra National High School and Sta. Cruz Public Market; Carmenchu Residences, Villa Silangan Subd. and San Francisco Subd. in Bgys. Pagsawitan, San Pablo Sur, Santo Angel Sur, Calios, Santo Angel Central, Santo Angel Norte, Umboy, Santisima Cruz and Town Proper in Sta. Cruz.
  • Portion of Quezon Ave. and Calumpang – Sta. Cruz Road from Pedro Guevarra Ave. to Jehovah’s Witness including Monserrat Subd., Jamaica Subd., Ajdramm Subd., Bayside Subd., Leonora Subd., Villa Josefina Subd., Villa Rosa Subd., Lynville Homes 8 Subd. Phases I & II, Minorka Ville Subd., Remedios Country Homes, Laguna Heights, Lynville Subd., Residenza de Sta. Cruz Subd., Remedios Country Homes II, Sitio 1, 2, 3, 4 & 5 and Sitio Acacia in Bgys. Santo Angel Sur, Patimbao, Santo Angel Central, Calios, Bagong Bayan (Bagumbayan), Bubukal, Labuin, San Juan, Malinao, San Jose, Oogong and Town Proper in Sta. Cruz.

 

MALOLOS, BULACAN

Line reconstruction works along Matimbo Barangay Road in Bgys. Matimbo and Mambog in Malolos City, Bulacan.

Between 10 a.m. and 10:30 a.m.:

  • Portion of Matimbo Barangay Road from Paraan St. to Mambog Barangay Hall including Purok 6, Purok Gitna, Purok Salapungan, Purok Baog, Purok Kapatan, Sitio Ibayo and Purok Ilang-Ilang in Bgys. Balite, Mambog, Matimbo and Panasahan.

 

STO. TOMAS, BATANGAS

Maintenance works inside First Philippine Industrial Park (FPIP), Bgy. Sta. Anastacia, Sto. Tomas City, Batangas Province.

Between 9 a.m. and 4 p.m.: 

  • Meltec Philippines Corp. in First Philippine Industrial Park (FPIP), Bgy. Sta. Anastacia.

—AOL, GMA Integrated News