Filtered By: Serbisyopubliko
Serbisyo Publiko
LIST

Road reblocking and repair schedule for Feb. 28-March 2, 2020


Heavier than usual traffic could be expected along several Metro Manila roads due to scheduled road reblocking and repair from Friday-February 28 to Monday-March 2, 2020, the Department of Public Works and Highways (DPWH) said.

The DPWH said the road reblocking and repair would start at 11 p.m. on Friday, with the roads to be reopened by 5 a.m. on Monday.

The roads to be be affected were:

EDSA

  • southbound from Guzent Inc. – Construction Equipment Sales & Rental to Bansalangin Street, 5th lane from sidewalk
  • southbound approach B.P. Tuazon Flyover to approach of A. Boni Serrano Flyover, 3rd lane from MRT Line
  • northbound after Aurora Boulevard to New York Street, 3rd lane from sidewalk

A. Bonifacio Avenue

  • southbound from J. Manuel to Sergeant Rivera Street, 3rd lane from sidewalk

General Luis Street

  • westbound from SB Diversion Road to Samote Street

Elliptical Road

  • westbound from Corner Maharlika Street, 9th lane from outer sidewalk

Motorists were advised to expect traffic slowdowns and to use possible alternate routes. — Joahna Lei Casilao/DVM, GMA News